Go Back   Shipping History > Search Forums

Showing results 1 to 1 of 1
Search took 0.00 seconds.
Search: Posts Made By: R58484957
Forum: Cunard 23rd April 2021, 08:06
Replies: 3
Views: 1,865
Posted By R58484957
The 6 boilers in use were C1 to C4 and D1&2 which...

The 6 boilers in use were C1 to C4 and D1&2 which fed steam to the after ER and then to the two inboard props. While in Aruba she had 294 boiler tubes replaced. Ted Phillip the advisory chief on...
Showing results 1 to 1 of 1

 
Forum Jump

All times are GMT +1. The time now is 11:15.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.