In my humble opinion, I believe that the transit of these huge ships should be analyzed and studied again to carry out the transit through the Panama and Suez Canals. It should be considered that both canals (Panama and Suez) were built and delivered in 19th and 20th centuries, for existing ships at that time; ships with a totally different design to those of now, with a smaller size and tonnage, measures more different than the current ones, this would require a restructuring of the transit of this new design of these vessel, to rule abot the number of containers embarked on board and the conditions of the trimming of the containers on board.
Regards
Tomi.
|